IN TIME DESIGN

View Original

Ilkley Grammar Cubicles

Another fantastic washroom refurbishment at Ilkley Grammar School Leeds, changing the exiting 6No toilet layout to a 8No cubicles open plan Washroom. Removing 3 walls and ripping out all the worn & damaged existing set up, reworking the existing services to work with the new cubicle lay out. Including new suspended ceiling, LED lighting, solid surface wash troughs, new flooring with white decoration to the walls.

A challenging project with a short window to complete during the summer holidays.

In Time Design delivered a great looking washroom with solid surface trough sinks for the whole nursery to enjoy.

#SchoolRefurbishment #Hyginic #Durable #WashRooms #LetsTalk