Wigton Library Refurb
In Time Design had the pleasure to completely refurbish an existing library area thanks to Wigton Moor Primary.
A full strip out including full decoration & floor installation along with the manufacture & install of bespoke library units, & a built-in feature wall design helped give the room a fresh & fun new look with maximum storage as the clients brief.
Working closely with the school we created a fun, bright & exciting space for all the primary children to enjoy.
“From the very first meeting to the completion of projects I have found In Time Design a professional company to work with. We met with Daniel to discuss our requirements for a complete refurbishment of our KS1 library area. We had an idea of what we wanted which changed as more ideas were introduced. Daniel met with us regularly to provide drawings, advice and assist with our design. The work was undertaken on time and to a very high standard. We found both Daniel and the team that undertook the work were solution-focused, an alteration mid-way through the project was required and as a team, they worked through the issue and found a way to make it work. Communication is at a high standard and thank you to Katie in the office for keeping in touch with us on a regular basis.
The new library has provided an enhanced and rich learning environment for our pupils. Thank you and I look forward to our next project.”
Melanie Bowen, Wigton Moor Primary School
furniture + refurbishment + build
#DesignandFit #LibraryFurniture #SoftSeating #Joinery #LetsTalk